About Us
 

  January 17, 2006

Fossil completes Fly Ash system upgrade for Nova Scotia Power's Tufts Cove GS.


Fossil Power has successfully completed the design and installation of upgraded Allen Bradley based Fly Ash System controls at the Tufts Cove Generating Station. This project included modifying the existing hardwired based PLC controls which utilized a mimic panel interface to a PC based Operator interface system that interfaces to the plants existing DCS.


<< Back
 
  Projects | Manufacturing | Careers | News | Disclaimer | Contact Us
  About Us | Flame Scanners | Ignitors | Fuel Handling | Water Level Measurement | Controls | Home