| |
March 24, 2006
Fossil equipment to be installed on third boiler at PacifiCorp plant.
For the fourth time, PacifiCorp has selected FPS oil ignitors, valve racks and ignitor controls to upgrade its operations. This new project will be the third boiler at the Dave Johnston plant in Wyoming to be equipped with Fossil products.
<< Back
|
|
|