About Us
 

  March 24, 2006

Fossil equipment to be installed on third boiler at PacifiCorp plant.


For the fourth time, PacifiCorp has selected FPS oil ignitors, valve racks and ignitor controls to upgrade its operations. This new project will be the third boiler at the Dave Johnston plant in Wyoming to be equipped with Fossil products.


<< Back
 
  Projects | Manufacturing | Careers | News | Disclaimer | Contact Us
  About Us | Flame Scanners | Ignitors | Fuel Handling | Water Level Measurement | Controls | Home