About Us
 

  November 16, 2005

Fossil completes a turnkey installation of BMS project for International Paper's Franklin Mill.


Fossil has successfully completed a turnkey BMS project on the No.7 power boiler for International Paper in Franklin, Virginia. This project included the design, supply, and commissioning of BMS, operator interface, ignitors, flame scanners, and oil valve trains. Fossil was also responsible for the electrical and mechanical installation, and complete commissioning of the system.


<< Back
 
  Projects | Manufacturing | Careers | News | Disclaimer | Contact Us
  About Us | Flame Scanners | Ignitors | Fuel Handling | Water Level Measurement | Controls | Home