| |
Oct 02, 2006
(Southern Co.) Alabama Power – Gaston Station, chooses Fossil Equipment for the third unit.
Throughout 2006 Alabama Power, Gaston Station, has placed three orders for three units of Fossil Power Equipment.. The third order was just placed with Fossil, and it is identical in scope to the first two units; that is oil ignitors, fuel and air supply valve trains utilizing Fossil valves, and a Duplex Blower Skid for redundancy in the supply of cooling and combustion air. This latest order will be shipped before the end of 2006.
<< Back
|
|
|