| |
September 9, 2005
Fossil is awarded the Fly Ash controls contract for the AEC Lowman Generating Station.
Fossil Power has been awarded a contract to upgrade the PLC controls for the Fly Ash Handling Plant at the AEC Lowman Generating Station located in Leroy, Alabama. This upgrade will include controls for a new Filter/Collector system supplied and installed by B&W. The control will be with Allen Bradley PLC and will utilize PanelView Stations as the Operator Interface device. Commissioning is expected to be completed in March 2006.
<< Back
|
|
|